Which side of the job are you on?
Tenvia Build runs the commercial side of construction projects: the contract, the trades, the costs, and the money. What you need from it depends on whether you’re building the work, tendering it, or certifying what gets claimed against it.
General and trade contractors running the job: bidding, costs, and billing that withholds holdback properly.
What it does for you → ArchitectsTendering on an owner’s behalf and administering the contract, without touching how your practice bills its time.
What it does for you → Engineers & owner’s repsReviewing what’s claimed line by line, certifying it, and keeping a dated record of every instruction.
What it does for you →One record, whichever side you’re on.
The three roles read the same project from different angles. Nobody re-keys anything, and nobody assembles the commercial picture by hand.
The contract, live
Original sum, approved changes, and pending signatures on one tab that reads like the printed document.
Every change signed on its own
Change orders are issued and signed individually, dated, and kept on the record, credits included.
Tendering on locked scope
Every bidder prices identical rows through a private link, so the comparison is real and the award is defensible.
Compliance with expiry dates
Insurance, WSIB clearances, and trade licences per vendor, with warnings before they lapse.
Billing built for Canada
Schedule-of-values claims with both holdback kinds withheld on the invoice itself, not tracked beside it.
A record that holds up
Audit history on projects, clients, and vendors, an owner portal, and a full export whenever you want it.
Not sure which fits? The features page walks the whole job in order, or book a demo and we’ll tell you honestly whether it suits how you work.
See it against a job you know.
Thirty minutes, your workflow, honest answers about what we do and don’t do yet.